Skip to main content

SUU Digital Library

Add or remove other collections to your search:



Narrow your search by:



You've searched: All Collections

  • All fields: worked
(251 results)



Display: 20

    • 120-B and 151-M

    • Iron mines and mining--Iron County (Utah); Utah International, Inc.
    • 120-B dug all month on 5530 elevation in east end and N. W. section of pit. 151-M worked all month in the S. W. section of pit on elevation 5550 and 5533.
    • 4 April 1951

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • SHE 52 moved to D.M. Hill on 10 March 1951. SHE 55 worked most of the month in rotary blast in the northwest section of the Pit at 5445 elevation. 80-D worked part of the month in the Short Line Pit at 5445 elevation, southwest section, digging all...
    • Rock Day Shift in 1950

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 120-B worked most of the month in the common northwest section of Pit. SHE 52 worked most of the month in rock, in the southwest section. SHE 55 started digging on the rock day shift Aug. 26, 1950 at 22 West 5.5 North.
    • Overview of Short Line Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 52-M worked most of the month digging common in the north section of Short Line Pit. 55-M worked most of the month in the southwest section of the Pit, digging rock.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • SHE 52 worked most of the month in the west section of Pit on the 5510 and 5480 elevations, digging rock and common. SHE 55 worked all month in rock at coordinates 6.5-8.5 North, 14-20 West.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • SHE 52 worked in rock and common at 5480 elevation, in the northwest section of Pit. SHE 55 worked all month in the southwest section of the Pit on the 5490 elevation.
    • 5 March 1951

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • SHE 52 worked in C.D. shot west end 5480 elevation and some com. at 26 West-8.5 North, 5480 elevation. SHE 55 worked in rock in the southwest section of Pit at the 5480 elevation.
    • SHE-55

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • SHE-55 worked most of digging rock in west end S.L. pit elevation 5445. 80-D started digging 10% ramp down old 5% haul road 4-28-51, west end S.L. Pit
    • Panoramic view of mine

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M Marion worked all month in the northeast section of pit on elevation 5565. 120-B Bucyrus Erie worked in southwest section and along south side. 80-D northwest worked in 8% road cut for two weeks.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M Marion worked most of the month in the east section of the pit at 5565 and along the north side at 5550. 120-B Bucyrus Erie worked along the south side in rock at 5562.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M working at 900 N. 1900 W. and elevation 5550. 120-B working at 500 N. 1800 W. and elevation 5562. 80-D northwest worked all month in 8% haul road cut.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 80-D northwest worked most of the month in 8% road cut. 80-D sent to Iron Springs 20 April 1950. Hopper yard near completion.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M worked 4 weeks in the northeast section of pit and 1 week to finish the 1st contract in 8% road cut. 120-B worked all month along the southeast side and then put on the spot for the general overhaul. Drilling continued during the lull between...
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 52-M worked in common 5520 elevation north section of pit most of the month. 120-B to Iron Springs 15 Sept. 1950. 55-M worked most of the month in rock along south side of Pit, coordinates 23 West 5.5 North to 14 West 6 North.
    • Socotwa text: page 001

    • Glen Canyon (Utah and Ariz.); Rafting (Sports)--Colorado River (Colo.-Mexico)
    • The second weekend of June may have seemed quite ordinary to the rest of the world, but to a select few, excitement was afoot. In various Salt Lake homes (to be revealed later), people bustled about airing bed rolls, buying lip balm, cleaning...
    • Socotwa text: page 009

    • Glen Canyon (Utah and Ariz.); Rafting (Sports)--Colorado River (Colo.-Mexico)
    • river, we carefully scanned the cliffs, sky, and water for objects of interest. In our survey we noted: three blue herons, majestically soaring above; five puffy little clouds; the honey-combing of the swallows' nests at the tops of the walls; and...
    • Socotwa text: page 014

    • Glen Canyon (Utah and Ariz.); Rafting (Sports)--Colorado River (Colo.-Mexico)
    • all the crews to return, we made loblollies on the beach and watched the frogs which fearlessly sat next to us. Stan had succeeded in breaking down the sand bar on one side so that the jump across the little stream and the giant loblolly was a...

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK