Skip to main content

SUU Digital Library

Add or remove other collections to your search:



Narrow your search by:



You've searched: All Collections

  • All fields: overview
(108 results)



Display: 20

    • Page 18

    • Writing--Technique; Fiction--Technique
    • Writing the Great American Novel 18 Lesson Overview Lesson 1: This lesson teaches the three steps that show to make an outline that ensures that the message is clear and compelling. 1. The presenter needs to decide on the Goal of the presentation....
    • Page 29

    • Writing--Technique; Fiction--Technique
    • Writing the Great American Novel 29 There are two rules for Box 4. Hero needs to be heroic—no one else can resolve the story or the author has failed the reader. Hero can perish, but must resolve the major elements of the story before he does Slide...
    • Page 43

    • Students--Testing.; Education--Testing.; Educational technology.
    • SRS TECHNOLOGY AND ENGAGEMENT 43 Johnson, M. (2012). Using Student Response System (SRS) to reduce off-task behavior of students with behavior problems. Rowan University. Retrieved...
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M Marion worked most of the month in the east section of the pit at 5565 and along the north side at 5550. 120-B Bucyrus Erie worked along the south side in rock at 5562.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M working at 900 N. 1900 W. and elevation 5550. 120-B working at 500 N. 1800 W. and elevation 5562. 80-D northwest worked all month in 8% haul road cut.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 80-D northwest worked most of the month in 8% road cut. 80-D sent to Iron Springs 20 April 1950. Hopper yard near completion.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M worked 4 weeks in the northeast section of pit and 1 week to finish the 1st contract in 8% road cut. 120-B worked all month along the southeast side and then put on the spot for the general overhaul. Drilling continued during the lull between...
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • East end of pit completed to 5550 elevation. Drilling in the east center of pit showing ore. 120-B working east on north side on elevation 5550. 151-M leveled south side to 5550 elevation and moved to the southwest section.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 52-M worked in common 5520 elevation north section of pit most of the month. 120-B to Iron Springs 15 Sept. 1950. 55-M worked most of the month in rock along south side of Pit, coordinates 23 West 5.5 North to 14 West 6 North.

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK