Skip to main content

SUU Digital Library

Add or remove other collections to your search:



Narrow your search by:



You've searched: All Collections

  • All fields: overview
(34 results)



Display: 20

    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M Marion worked most of the month in the east section of the pit at 5565 and along the north side at 5550. 120-B Bucyrus Erie worked along the south side in rock at 5562.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M worked 4 weeks in the northeast section of pit and 1 week to finish the 1st contract in 8% road cut. 120-B worked all month along the southeast side and then put on the spot for the general overhaul. Drilling continued during the lull between...
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M working at 900 N. 1900 W. and elevation 5550. 120-B working at 500 N. 1800 W. and elevation 5562. 80-D northwest worked all month in 8% haul road cut.
    • Page 33

    •  
    • 28 approach that is a combination of the other three instructional strategies, vocabulary, text features, and text structure. The instructors were each given an outline of instruction to follow (see Appendix D), a graphic organizer geared toward...
    • Page 34

    •  
    • 29 After an overview of the lesson outline, the instructors were given further directions depended upon their assigned instructional group. The researcher explained how to teach each method with the provided graphic organizers and expository...
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 52-M worked in common 5520 elevation north section of pit most of the month. 120-B to Iron Springs 15 Sept. 1950. 55-M worked most of the month in rock along south side of Pit, coordinates 23 West 5.5 North to 14 West 6 North.
    • Overview of Short Line Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 52-M worked most of the month digging common in the north section of Short Line Pit. 55-M worked most of the month in the southwest section of the Pit, digging rock.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 80-D northwest worked most of the month in 8% road cut. 80-D sent to Iron Springs 20 April 1950. Hopper yard near completion.
    • Page 489

    •  
    • Brigham Young in July of 1847. He made a round trip to California by way of Cedar Valley in the winter and spring of 1847-48, returning with cattle and wagons--the first such conveyances to cross the Old Spanish Trail. Jefferson Hunt returned again...
    • Page 9

    •  
    • COMMUNICATION THEORIES 10 theories constitute, or make, an experience of communication. Theories communicate about communication” (p. 8). Communication Theory is typically a foundation class for Communication majors at both undergraduate and...
    • Page 29

    •  
    • COMMUNICATION THEORIES 30 Pearce, W. B. (2005). The coordinated management of meaning (CMM). Theorizing Communication and Culture, 35-54. Pearce, W. B., & Cronen, V. (1980). Communication, action, and meaning: The creation of social realities. New...
    • Page 10

    •  
    • DAVID’S VS. GOLIATH 10 Chapter 2: Literature Review This literature review is a compilation of theories and history that explain how the field of public relations has arrived where it is today. The sections included in order are: • Evolution of...
    • Page 8

    •  
    • DAVID’S VS. GOLIATH 8 Introduction The field of Public relations has been around for quite a while, dating back to the early 20th century quite some time gaining good and bad publicity around the world (PRSA, 2009). The creation of large PR firms...
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • East end of pit completed to 5550 elevation. Drilling in the east center of pit showing ore. 120-B working east on north side on elevation 5550. 151-M leveled south side to 5550 elevation and moved to the southwest section.

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK