Skip to main content

SUU Digital Library

Add or remove other collections to your search:



Narrow your search by:



You've searched: All Collections

  • All fields: month
(314 results)



Display: 20

    • Rockville, Hubor's water wheel

    • Rockville (Washington County, Utah)
    • Hubor's water wheel. Taken by Howard R. Driggs on first proselyting trip taken from BNS, in the year 1898. Kumen Jones was the driver of the carriage. They spent a month travelling over Southern Utah speaking to the people about the school.
    • Monuments, Mountain Meadow

    • Mountain Meadow (Washington County, Utah); Monuments; Mountain Meadows Massacre, 1857
    • First monument at Mountain Meadow, Kumen Jones in picture. Taken by Howard R. Driggs on the first proselyting trip taken from the BNS in the year 1898. Kumen Jones was the driver of the carriage. They spent a month travelling over Southern Utah...
    • Silver Reef mine

    • Mines and mineral resources; Silver Reef (Washington County, Utah)
    • Silver Reef Mine, taken by Howard R. Driggs on the first proselyting trip taken from the BNS. Kumen Jones was the driver of the carriage. They spent a month travelling over Southern Utah speaking to people about the school.
    • Wakefield, Adeline Leonard -- Maypole

    • Leonard, Adeline; Maypole; Mayday Celebration; Primary; Huntington (Utah)
    • Merry Month of May -- Primary children braid the maypole. Adeline Leonard says the "Highlight of her Primary career was being Queen of Mayday. Celia Leonard and Luzette Blackburn were my maids. Mother made me a sweet white dress and fussed it all...
    • Smith claim

    • Iron mines and mining--Iron County (Utah); Utah International, Inc.
    • Working in ore on the 5630 elevation during the month of Sept. 6. 190 cubic yards of stripping were moved, and 21,038 tons of ore were hauled to the plant.
    • 120-B and 151-M

    • Iron mines and mining--Iron County (Utah); Utah International, Inc.
    • 120-B dug on 5550 elevation in east end of pit all month. 151-M dug in the S. W. section of pit on the 5550 elevation and along the south side of 1st. stage on elevation 5533.
    • 120-B and 151-M

    • Iron mines and mining--Iron County (Utah); Utah International, Inc.
    • 120-B dug all month on 5530 elevation in east end and N. W. section of pit. 151-M worked all month in the S. W. section of pit on elevation 5550 and 5533.
    • Armstrong Pit, Lindsay Hill arial

    • Iron mines and mining--Iron County (Utah); Utah International, Inc.
    • Armstrong Pit, Lindsay Hill arial. SHE-22, working in area on the 6025 elevation. During three month period, Jan.1 to April 1, 4816 cu. yds of stripping were removed from pit and 15,659 tons of ore were hauled to plant.
    • Armstrong Pit

    • Iron mines and mining--Iron County (Utah); Utah International, Inc.
    • Lindsay Hill - Iron Springs - Armstrong Pit. Very little mining has been done in Armstrong Pit. During three month period, Oct.1 to Jan.1, 2117 ton of ore were hauled to plant and 3,463 cu. yds. of waste were hauled from pit.
    • Burke Stripping

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • SHE-74, working on elevation 6600. SHE-78, working on elevation 6635. EDE-26, drilling on elevation 6600. During the month of October 467,056 cubic yards of stripping was moved.
    • Smith Claim

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • Four wagon drills, drilling ore on elevation 5615. SHD-43, shipped to Salt Lake. During the month of January, 4,843 cubic yards of stripping were moved and 19,512 tons of ore were hauled to the plant.
    • Panoramic view of mine

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M Marion worked all month in the northeast section of pit on elevation 5565. 120-B Bucyrus Erie worked in southwest section and along south side. 80-D northwest worked in 8% road cut for two weeks.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M Marion worked most of the month in the east section of the pit at 5565 and along the north side at 5550. 120-B Bucyrus Erie worked along the south side in rock at 5562.

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK