Skip to main content

SUU Digital Library

Add or remove other collections to your search:



Narrow your search by:



You've searched: All Collections

  • All fields: month
(155 results)



Display: 20

    • Page 324

    •  
    • $ 2 0 , and Traffic Violations--$15, Total--$414. April 5 , 1945.. .Mr. Ashcroft r e p o r t s t h a t the Post War Planning Committee should be re-organized and some definite action taken in going ahead with post-war plans. Mr. Ianthus Wright...
    • 120-B and 151-M

    • Iron mines and mining--Iron County (Utah); Utah International, Inc.
    • 120-B dug all month on 5530 elevation in east end and N. W. section of pit. 151-M worked all month in the S. W. section of pit on elevation 5550 and 5533.
    • 120-B and 151-M

    • Iron mines and mining--Iron County (Utah); Utah International, Inc.
    • 120-B dug on 5550 elevation in east end of pit all month. 151-M dug in the S. W. section of pit on the 5550 elevation and along the south side of 1st. stage on elevation 5533.
    • Rock Day Shift in 1950

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 120-B worked most of the month in the common northwest section of Pit. SHE 52 worked most of the month in rock, in the southwest section. SHE 55 started digging on the rock day shift Aug. 26, 1950 at 22 West 5.5 North.
    • Page 15

    •  
    • 15 promote our featured activity of the week to get guests thinking about how to spend their leisure time the minute they begin their stay with us. In the next year’s activity inventory, Marriott hopes to see a strong improvement in our special...
    • Panoramic view of mine

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M Marion worked all month in the northeast section of pit on elevation 5565. 120-B Bucyrus Erie worked in southwest section and along south side. 80-D northwest worked in 8% road cut for two weeks.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M Marion worked most of the month in the east section of the pit at 5565 and along the north side at 5550. 120-B Bucyrus Erie worked along the south side in rock at 5562.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M worked 4 weeks in the northeast section of pit and 1 week to finish the 1st contract in 8% road cut. 120-B worked all month along the southeast side and then put on the spot for the general overhaul. Drilling continued during the lull between...
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M working at 900 N. 1900 W. and elevation 5550. 120-B working at 500 N. 1800 W. and elevation 5562. 80-D northwest worked all month in 8% haul road cut.
    • Page 41

    •  
    • 1875.. - .Mayor and Councilmen: Mayor: Councilmen: Francis Webster Christopher J . Arthur George P e r r y Jens Nielson Robert Heyborne John V . Adams Jan. 11, 1875.. . a committee was appointed to obtain lands for streets, e t c . It was...
    • Page 23

    •  
    • 19 teachers, the researcher then decided what core classes to teach. The core classes that students needed to graduate were English, history, math, and science. The researcher then needed to find fifteen willing students to participate in the...
    • Page 466

    •  
    • 1986. Unanimous. (Water rate in 1968 was $8 per quarter, or $2.67 per month. Water rate is now 6 times higher. ) Motion to amend the Sewer Ordinance to put into effect a 33% increase, from $4.50 to $6 per month. Also, a motion was made setting the...
    • Page 25

    •  
    • 21 Chapter 4 Results Introduction Discovering whether or not a collaborative study program would be beneficial in helping students earn credit toward high school graduation was the primary goal of this study. The students met for a total of ten...
    • Page 26

    •  
    • 22 the month of March 2011, both groups saw a dramatic increase, about 75% higher than the previous month. During December 2011, the credit dropped for both groups; 28% for the average student and 9% for the student involved in the collaborative...
    • Page 27

    •  
    • 23 groups earned; both the males and the females lowered the amount of credit completed by 31%. The males fluctuated, dropping 8% in October and 10% in December. They then completed 68% more credit in January. The females also dropped in October;...
    • Page 28

    •  
    • 24 completed compared to the eleventh and twelfth graders. The eleventh graders had the highest percentage, almost reaching an average of a full credit completed per month in November 2011 and January 2012. All of the students in the collaborative...
    • Page 30

    •  
    • 25 5th-grade year, 1st month, and the pretest mean of 4.32 refers to 4th-grade year, 3rd month, with a mean difference of 0.82, which can be understood as a reading-level improvement of 8 months (out of 9 months in a school year). Table...
    • Page 29

    •  
    • 25 more than the Caucasian students. Both groups earned more than the students not involved in any collaborative group setting. Table 3 Hispanic Students versus Caucasian Students in the Collaborative Learning...
    • Page 31

    •  
    • 27 credit than other students five of the reported months. 0.670.760.750.600.580.880.581.310.630.631.210.710.650.620.490.770.350.260.410.390.340.240.180.38Jan.2011Feb.2011March.2011July-Sept.2011Oct.2011Nov.2011Dec.2011Jan.2012Average Amount of...

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK