Sept. 20, 1979.. . T h e Mayor informed t h e Council on. updated information concerning Kolob Water, a f t e r attending a Water Resources Board meeting. He a s s u r e d the Council t h a t all misunderstandings concerning the 215 water s h a r e...
Oct. 17. 1985 . . . Conrad Hatch made a motion to adopt an agreement with I . C . P . A . to p r e s e n t a proposal for a n alternate power system. Shaun McLeroy was t h e winner of t h e City Flag contest. Nov. 5. 1985.. .Tabulation of election...
Iron mines and mining--Iron County (Utah); Utah International, Inc.
Display of rotary tric-cone bit used with Stanton carbide. Used for drilling holes in very hard iron ore. Holes were then loaded with explosives. On picture, :Rl #2 666288 1485" 51 1/2 HR total."
Iron mines and mining--Iron County (Utah); Utah International, Inc.
Display of rotary tric-cone bit used with Stanton carbide. Used for drilling holes in very hard iron ore. Holes were then loaded with explosives. On picture, "784 Ft. 25 1/2 HR."
Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
Display of rotary tric-cone bit used with Stanton carbide. Used for drilling holes in very hard iron ore. Holes were then loaded with explosives. On picture, " Oct. 25 1952 #66289 482" 22 1/4 HR."
Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
SHE-74, working on elevation 6600. SHE-78, working on elevation 6635. EDE-26, drilling on elevation 6600. During the month of October 467,056 cubic yards of stripping was moved.
Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
Mining began in the middle of March. EDA-29, drilling on 5985 elevation. During half of the month, 5,611 cubic yards of stripping was removed. Photo looking north.
Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
Four wagon drills, drilling ore on elevation 5615. SHD-43, shipped to Salt Lake. During the month of January, 4,843 cubic yards of stripping were moved and 19,512 tons of ore were hauled to the plant.
Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
151-M worked 4 weeks in the northeast section of pit and 1 week to finish the 1st contract in 8% road cut. 120-B worked all month along the southeast side and then put on the spot for the general overhaul. Drilling continued during the lull between...
Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
East end of pit completed to 5550 elevation. Drilling in the east center of pit showing ore. 120-B working east on north side on elevation 5550. 151-M leveled south side to 5550 elevation and moved to the southwest section.
Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
Blowout Pit, Iron Mountain. SHE-74, working in ore. EDE-26, drilling in ore. During three month period, (Oct., Nov., and Dec.) 52,918 tons of ore were hauled to plant and 2,100 cu. yds. of stripping were hauled from pit.