Skip to main content

SUU Digital Library

Add or remove other collections to your search:



Narrow your search by:



You've searched: All Collections

  • All fields: cubic
(15 results)



Display: 20

    • 1897, page 10

    •  
    • Courses of Study. The Branch Normal School will this year offer two courses of study: 1. The first three years of the regular four years' course leading to a Normal certificate. 2. A preparatory course for students over eighteen years...
    • 1898, page 11

    •  
    • COURSES OF STUDY. The Branch Normal School will this year offer two courses of study: 1. The first three years of the regular four years' course leading to a Normal certificate. 2. A preparatory course for students over...
    • 1899, page 23

    •  
    • COURSES OF STUDY. The Branch Normal School will this year offer two courses of study. 1. The first three years of the regular four years' course leading to a Normal certificate. 2. A preparatory course for students over eighteen years...
    • 1900, page 25

    •  
    • 25 STATE NORMAL SCHOOL. COURSES OF STUDY. The Branch Normal School will this year offer two courses of study. 1. The first three years of the regular four years' course leading to a Normal certificate. 2 A preparatory course for...
    • Page 378

    •  
    • water tank for the water line from Quitchapah. Unanimous. M r . Platt advises that t h e city build a dike across t h e Lake M r . S t a r k will do the job for $1200, o r 3000 cubic now. y a r d s at 40Q p e r cubic y a r d . The Council decided...
    • Page 410

    •  
    • history of Cedar City. He thanked the Councilmen for their cooperation and dedication. He acknowledged the cooperation a n d help received from the Utah s t a t e - Road ~ o m & s i o n , College. California Pacific Utilities, and other...
    • Page 428

    •  
    • opposite--60'1, to t h e west into t h e Woodbury Ditch a n d 40% to t h e n o r t h in t h e main channel of Coal Creek. State Engineer, Gerald S t o k e r , indicated t h a t t h e decreed r i g h t s call for 285 cubic feet p e r second to be...
    • Burke Stripping

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • SHE-74, working on elevation 6600. SHE-78, working on elevation 6635. EDE-26, drilling on elevation 6600. During the month of October 467,056 cubic yards of stripping was moved.
    • Smith Claim

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • Four wagon drills, drilling ore on elevation 5615. SHD-43, shipped to Salt Lake. During the month of January, 4,843 cubic yards of stripping were moved and 19,512 tons of ore were hauled to the plant.
    • Smith claim

    • Iron mines and mining--Iron County (Utah); Utah International, Inc.
    • Working in ore on the 5630 elevation during the month of Sept. 6. 190 cubic yards of stripping were moved, and 21,038 tons of ore were hauled to the plant.

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK