Skip to main content

SUU Digital Library

Add or remove other collections to your search:



Narrow your search by:



You've searched: All Collections

  • All fields: along
(404 results)



Display: 20

    • Page 78

    •  
    • "By the later part of October 1879, the Sreater part of the pilgrims that were to make up the company booked for the San Juan Mission were on wheels headed for the Colorado River at a point east of the Escalante Desert. There were only a few in...
    • Page 226

    •  
    • 1 , 1920 for t h e following: 1. $9000 to install a modern a n d complete s t r e e t lighting system, owned a n d controlled b y t h e 2. $14,000 for establishing a n d improving t h e City City. Park. 3. $50,000 for increasing, improving,...
    • Page 314

    •  
    • 1 William Arthur Jones and Myron F. Higbee [holdover Councilmen) of the outgoing Council and Clarence E. Miller, Clinton Milne, Lorin C. Miles, and Parley Dalley of the incoming Council. Also, Loretta B. Riddle, Recorder elect. and Hurshcell G ....
    • Page 17

    •  
    • 10 the new core standards while also using specific grammar, punctuation, phrases and clauses as required by the Core Curriculum State Standards. (Please see definitions for specifics.) Setting The setting for this study is in a regular 9th grade...
    • Page 12

    •  
    • 12 Three Score and Ten in Retrospect brother's college exoenses. Everett worked in the summer as an electrician for the telephone company; and after he graduated in pharmacy, he continued working to help his dad with expenses for John and Maxine...
    • 120-B and 151-M

    • Iron mines and mining--Iron County (Utah); Utah International, Inc.
    • 120-B dug on 5550 elevation in east end of pit all month. 151-M dug in the S. W. section of pit on the 5550 elevation and along the south side of 1st. stage on elevation 5533.
    • Panoramic view of mine

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M Marion worked all month in the northeast section of pit on elevation 5565. 120-B Bucyrus Erie worked in southwest section and along south side. 80-D northwest worked in 8% road cut for two weeks.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M Marion worked most of the month in the east section of the pit at 5565 and along the north side at 5550. 120-B Bucyrus Erie worked along the south side in rock at 5562.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M worked 4 weeks in the northeast section of pit and 1 week to finish the 1st contract in 8% road cut. 120-B worked all month along the southeast side and then put on the spot for the general overhaul. Drilling continued during the lull between...
    • Page 24

    •  
    • 17 was available to define grammar’s purpose. It was not until the twentieth century that linguists and teachers really started diving into the realm of research to discover how the English language’s structure should work most effectively. The...
    • Page 27

    •  
    • 20 which is first, Prewrite; second, Write; third, Revise; fourth, Edit; and finally, Publish. As paradigms shifted, “The writing process was at the heart of the student-centered composition class, where the product was de-emphasized, along with a...

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK