Zion tunnel: The shovel operated on compressed air. The truck was a Bulldog Mack which had solid rubber tires. The Nevada Contracting Company had 3 gasoline operated shovels and a fleet of Mack trucks. The trucks were eventually equipped with...
pipeline for culinary water to the Plant will be needed o r drinking water will have to be hauled to the Plant for the employees. (1975 North Bulldog Road) May 15, 1975.. .Mayor Kerry Jones held a public hearing to consider the final action on the...