    • 120-B and 151-M

    • Iron mines and mining--Iron County (Utah); Utah International, Inc.
    • 120-B dug on 5550 elevation in east end of pit all month. 151-M dug in the S. W. section of pit on the 5550 elevation and along the south side of 1st. stage on elevation 5533.
    • 120-B and 151-M

    • Iron mines and mining--Iron County (Utah); Utah International, Inc.
    • 120-B dug all month on 5530 elevation in east end and N. W. section of pit. 151-M worked all month in the S. W. section of pit on elevation 5550 and 5533.
    • Panoramic view of mine

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M Marion worked all month in the northeast section of pit on elevation 5565. 120-B Bucyrus Erie worked in southwest section and along south side. 80-D northwest worked in 8% road cut for two weeks.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M Marion worked most of the month in the east section of the pit at 5565 and along the north side at 5550. 120-B Bucyrus Erie worked along the south side in rock at 5562.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M working at 900 N. 1900 W. and elevation 5550. 120-B working at 500 N. 1800 W. and elevation 5562. 80-D northwest worked all month in 8% haul road cut.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 151-M worked 4 weeks in the northeast section of pit and 1 week to finish the 1st contract in 8% road cut. 120-B worked all month along the southeast side and then put on the spot for the general overhaul. Drilling continued during the lull between...
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • East end of pit completed to 5550 elevation. Drilling in the east center of pit showing ore. 120-B working east on north side on elevation 5550. 151-M leveled south side to 5550 elevation and moved to the southwest section.
    • Overview of Pit

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 52-M worked in common 5520 elevation north section of pit most of the month. 120-B to Iron Springs 15 Sept. 1950. 55-M worked most of the month in rock along south side of Pit, coordinates 23 West 5.5 North to 14 West 6 North.
    • Rock Day Shift in 1950

    • Iron mines and mining--Iron County (Utah); Mining machinery; Utah International, Inc.
    • 120-B worked most of the month in the common northwest section of Pit. SHE 52 worked most of the month in rock, in the southwest section. SHE 55 started digging on the rock day shift Aug. 26, 1950 at 22 West 5.5 North.

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK